summaryrefslogtreecommitdiffstats
path: root/src/common
Commit message (Expand)AuthorAgeFilesLines
* NVDIMM procedure updateChris Cain2018-10-291-0/+4
* Assert ddr_resetn during EPOW on NVDIMMsChris Cain2018-10-041-16/+20
* Support for NVDIMMsChris Cain2018-09-263-2/+8
* Memory:MPV:STC920:Zeppelin: OCC held in reset after a channel checkstopDouglas Gilbert2018-08-072-1/+3
* Enable GPE IPC TimersWilliam Bryan2018-05-171-1/+4
* Centaur SYNC required after changing throttleDouglas Gilbert2018-05-071-9/+8
* OCC Centaur disable deadman timer and clean up codeDoug Gilbert2018-04-041-47/+1
* P9 Centaur sensor supportDoug Gilbert2018-03-284-0/+314
* Memory Throttle SensorsWilliam Bryan2018-03-272-24/+64
* Try to PCAP GPU again after busy failureWilliam Bryan2018-03-072-7/+7
* OCC: Call Home Data LogAndres Lugo-Reyes2017-12-181-2/+2
* APSS Reset SupportDoug Gilbert2017-12-182-0/+5
* 405 GPU Power CappingWilliam Bryan2017-10-121-21/+63
* Enable hardware GPU power brakeDoug Gilbert2017-10-103-0/+17
* Correct gpe timebaseDoug Gilbert2017-10-031-1/+1
* GPU 405 Enable Memory TemperaturesWilliam Bryan2017-10-032-10/+27
* Enable safe mode memory throttlingmbroyles2017-08-291-4/+41
* 405 Side GPU Core Temp CollectionWilliam Bryan2017-08-251-13/+14
* Move I2C info to commonWilliam Bryan2017-08-241-0/+83
* Amended 24x7 code- 7/11/2017 config,500us ticSooraj Nair2017-08-161-1/+1
* Initial 405 GPU supportmbroyles2017-08-143-2/+91
* Timestamp data when collectedShawn McCarney2017-08-023-3/+55
* Add pointers to GPE trace buffersWilliam Bryan2017-07-282-2/+13
* Reduce number of checks when waiting for SPI completionmbroyles2017-07-261-1/+1
* rt_xstop_analysis: single proc fir collection is working, without pnor writesPrachi Gupta2017-07-211-0/+1
* rt_xstop_analysis: compile all of firdata on gpe0Prachi Gupta2017-07-211-1/+14
* Doorbell reorganizationWilliam Bryan2017-05-101-0/+5
* Memory Power Control when entering and exiting IPS (Idle Power Save)Wael El-Essawy2017-05-105-38/+173
* Enable PGPE support on hardwareChris Cain2017-04-251-1/+1
* APSS P8/P9 Spec CompatibilityWilliam Bryan2017-02-231-2/+3
* Turn off periodic GPE time stamp tracesWilliam Bryan2017-02-151-1/+4
* GPE Nest Frequency & Amester Name ChangesWilliam Bryan2017-02-141-2/+8
* Infrastructure for 24x7 data collectionmbroyles2017-02-142-2/+49
* Pstates Support in OCCWael El-Essawy2017-01-271-6/+6
* dcom/ thread/ rtls/ TODO clean upAndres Lugo-Reyes2016-12-159-0/+622
OpenPOWER on IntegriCloud