summaryrefslogtreecommitdiffstats
diff options
context:
space:
mode:
authorHiroshi Shimamoto <h-shimamoto@ct.jp.nec.com>2008-06-10 20:29:19 -0700
committerIngo Molnar <mingo@elte.hu>2008-06-18 12:34:15 +0200
commitf7d62364b2cef85cbcd4feffdd3632ef7c3b61c2 (patch)
tree72fe1468e67203a096368fde06c388b638b74d75
parentf9e8e07e074a880e110922759dcdb369fecdf07c (diff)
downloadtalos-obmc-linux-f7d62364b2cef85cbcd4feffdd3632ef7c3b61c2.tar.gz
talos-obmc-linux-f7d62364b2cef85cbcd4feffdd3632ef7c3b61c2.zip
sched: fix typo in Documentation/scheduler/sched-rt-group.txt
Fix minor typos. Signed-off-by: Hiroshi Shimamoto <h-shimamoto@ct.jp.nec.com> Signed-off-by: Ingo Molnar <mingo@elte.hu>
-rw-r--r--Documentation/scheduler/sched-rt-group.txt4
1 files changed, 2 insertions, 2 deletions
diff --git a/Documentation/scheduler/sched-rt-group.txt b/Documentation/scheduler/sched-rt-group.txt
index 14f901f639ee..3ef339f491e0 100644
--- a/Documentation/scheduler/sched-rt-group.txt
+++ b/Documentation/scheduler/sched-rt-group.txt
@@ -51,9 +51,9 @@ needs only about 3% CPU time to do so, it can do with a 0.03 * 0.005s =
0.00015s. So this group can be scheduled with a period of 0.005s and a run time
of 0.00015s.
-The remaining CPU time will be used for user input and other tass. Because
+The remaining CPU time will be used for user input and other tasks. Because
realtime tasks have explicitly allocated the CPU time they need to perform
-their tasks, buffer underruns in the graphocs or audio can be eliminated.
+their tasks, buffer underruns in the graphics or audio can be eliminated.
NOTE: the above example is not fully implemented as of yet (2.6.25). We still
lack an EDF scheduler to make non-uniform periods usable.
OpenPOWER on IntegriCloud