index
:
talos-hostboot
04-15-2018
04-16-2019
04-19-2018
04-30-2018
05-14-2018
05-21-2018
06-04-2018
06-18-2018
07-25-2019
master
Talos™ II hostboot sources
Raptor Computing Systems
summary
refs
log
tree
commit
diff
stats
log msg
author
committer
range
path:
root
/
src
/
build
/
configs
Commit message (
Expand
)
Author
Age
Files
Lines
*
Driver changes to support i2c mux
Roland Veloz
2018-12-06
1
-0
/
+1
*
Secure Boot: Enabled final Secure Boot settings for Zeppelin
Nick Bofferding
2018-06-04
1
-1
/
+0
*
Refactor SecureBoot Workarounds to better control leniency
Stephen Cprek
2017-08-25
1
-0
/
+2
*
Add new config used specifically for exporting attributes for MRW
crgeddes
2017-08-25
1
-0
/
+2
*
Resolve istep mode issue with istep 18 on FSP systems
Jaymes Wilks
2017-08-03
1
-1
/
+1
*
fixed compilation errors when IPLTIME_CHECKSTOP_ANALYSIS is enabled
Zane Shelley
2017-06-09
1
-0
/
+1
*
fixed compilation errors when ENABLE_CHECKSTOP_ANALYSIS is enabled
Zane Shelley
2017-06-08
1
-0
/
+4
*
Enable PM during IPL on OPAL with FSP
Corey Swenson
2017-05-23
1
-1
/
+1
*
move all non-volatile/openpower attributes from _hb to _openpower files
Prachi Gupta
2017-05-01
1
-0
/
+2
*
Change disable of SBE Updates
Marty Gloff
2017-03-07
1
-1
/
+1
*
Disable SBE updates on FSP based systems
Dean Sanner
2017-02-08
1
-1
/
+1
*
Enable updates of SBE SEEPROMs
Marty Gloff
2017-01-30
1
-1
/
+1
*
Fix the FSP config file
Corey Swenson
2017-01-16
1
-26
/
+4
*
Start PM Complex during IPL for OPAL
Corey Swenson
2017-01-04
1
-0
/
+4
*
SBE Update fixes and patches for Bring-up
Marty Gloff
2016-12-02
1
-0
/
+1
*
HDAT changes for Witherspoon
nagurram-in
2016-11-14
1
-0
/
+22
*
Update VPO config to 2.4 Ghz nest to for sync mode
Dean Sanner
2016-10-04
1
-0
/
+2
*
Remove core reduction based on PR field
Dan Crowell
2016-09-26
1
-1
/
+0
*
Updates to compile for P9 BMC_AST2400 istep control
Dean Sanner
2016-09-20
1
-0
/
+2
*
Add P9 vpo build config, config compile and extra traces for debug
Prachi Gupta
2016-06-06
1
-0
/
+5
*
Adding support for FSP-specific Configuration in P9
Elizabeth Liner
2015-12-11
1
-0
/
+6