|
This substructure is part of the callout subsection in the SRC section
of a PEL, and contains information about Manufacturing Replaceable Units
(MRUs). MRUs are components on a parent FRU (Field Replaceable Unit)
that may be able to be replaced in a manufacturing environment, hence
the name.
This substructure includes a list of <priority, MRU ID> pairs, where the
priority is the same priority value type as used elsewhere in the SRC
section ('H', 'M', 'L', etc), and the MRU ID is a 4B ID that development
will tell manufacturing the meanings of.
This commit only adds support for creating an object from a flattened PEL,
such as one that comes down from the host. A future commit will handle
creating it from scratch for BMC errors.
Signed-off-by: Matt Spinler <spinler@us.ibm.com>
Change-Id: I6352e1a3cb84db0516902786faca4c387afef411
|