diff options
-rw-r--r-- | drivers/usb/host/ehci-hcd.c | 2 | ||||
-rw-r--r-- | drivers/usb/host/ehci-sched.c | 30 |
2 files changed, 21 insertions, 11 deletions
diff --git a/drivers/usb/host/ehci-hcd.c b/drivers/usb/host/ehci-hcd.c index 4ed2c931daeb..546ad8814008 100644 --- a/drivers/usb/host/ehci-hcd.c +++ b/drivers/usb/host/ehci-hcd.c @@ -549,7 +549,7 @@ static int ehci_init(struct usb_hcd *hcd) /* controllers may cache some of the periodic schedule ... */ hcc_params = ehci_readl(ehci, &ehci->caps->hcc_params); if (HCC_ISOC_CACHE(hcc_params)) // full frame cache - ehci->i_thresh = 8; + ehci->i_thresh = 2 + 8; else // N microframes cached ehci->i_thresh = 2 + HCC_ISOC_THRES(hcc_params); diff --git a/drivers/usb/host/ehci-sched.c b/drivers/usb/host/ehci-sched.c index 84079ebbe656..1e391e624c8a 100644 --- a/drivers/usb/host/ehci-sched.c +++ b/drivers/usb/host/ehci-sched.c @@ -1394,10 +1394,11 @@ iso_stream_schedule ( struct ehci_iso_stream *stream ) { - u32 now, start, max, period; + u32 now, next, start, period; int status; unsigned mod = ehci->periodic_size << 3; struct ehci_iso_sched *sched = urb->hcpriv; + struct pci_dev *pdev; if (sched->span > (mod - SCHEDULE_SLOP)) { ehci_dbg (ehci, "iso request %p too long\n", urb); @@ -1418,26 +1419,35 @@ iso_stream_schedule ( now = ehci_readl(ehci, &ehci->regs->frame_index) % mod; - /* when's the last uframe this urb could start? */ - max = now + mod; - /* Typical case: reuse current schedule, stream is still active. * Hopefully there are no gaps from the host falling behind * (irq delays etc), but if there are we'll take the next * slot in the schedule, implicitly assuming URB_ISO_ASAP. */ if (likely (!list_empty (&stream->td_list))) { + pdev = to_pci_dev(ehci_to_hcd(ehci)->self.controller); start = stream->next_uframe; - if (start < now) - start += mod; + + /* For high speed devices, allow scheduling within the + * isochronous scheduling threshold. For full speed devices, + * don't. (Work around for Intel ICH9 bug.) + */ + if (!stream->highspeed && + pdev->vendor == PCI_VENDOR_ID_INTEL) + next = now + ehci->i_thresh; + else + next = now; /* Fell behind (by up to twice the slop amount)? */ - if (start >= max - 2 * SCHEDULE_SLOP) + if (((start - next) & (mod - 1)) >= + mod - 2 * SCHEDULE_SLOP) start += period * DIV_ROUND_UP( - max - start, period) - mod; + (next - start) & (mod - 1), + period); /* Tried to schedule too far into the future? */ - if (unlikely((start + sched->span) >= max)) { + if (unlikely(((start - now) & (mod - 1)) + sched->span + >= mod - 2 * SCHEDULE_SLOP)) { status = -EFBIG; goto fail; } @@ -1482,7 +1492,7 @@ iso_stream_schedule ( /* no room in the schedule */ ehci_dbg (ehci, "iso %ssched full %p (now %d max %d)\n", list_empty (&stream->td_list) ? "" : "re", - urb, now, max); + urb, now, now + mod); status = -ENOSPC; fail: |