summaryrefslogtreecommitdiffstats
path: root/drivers/net/qlcnic
diff options
context:
space:
mode:
authorKrishna Kumar <krkumar2@in.ibm.com>2011-04-14 06:07:04 +0000
committerDavid S. Miller <davem@davemloft.net>2011-04-17 23:27:16 -0700
commit0553c891fabd287726b41076cfd03fe7e5ab596f (patch)
tree6b8b7074ff457e1533e8c397e09c03cd86ddc76e /drivers/net/qlcnic
parent70dda99c41fc8a153e09bdba9adb7805ba2a4bb3 (diff)
downloadblackbird-op-linux-0553c891fabd287726b41076cfd03fe7e5ab596f.tar.gz
blackbird-op-linux-0553c891fabd287726b41076cfd03fe7e5ab596f.zip
ip6_pol_route panic: Do not allow VLAN on loopback
Several tests in the ipv6 routing code check IFF_LOOPBACK, and allowing stacking such as VLAN'ing on top of loopback results in a netdevice which reports IFF_LOOPBACK but really isn't the loopback device. Instead of spamming the ipv6 routing code with even more special tests, simply disallow VLAN over loopback. The result of this patch is: # modprobe 8021q # vconfig add lo 43 ERROR: trying to add VLAN #43 to IF -:lo:- error: Operation not supported Signed-off-by: Krishna Kumar <krkumar2@in.ibm.com> Signed-off-by: David S. Miller <davem@davemloft.net>
Diffstat (limited to 'drivers/net/qlcnic')
0 files changed, 0 insertions, 0 deletions
OpenPOWER on IntegriCloud